Options for Membrane Termination:
The waterproofing membrane ends shall be terminated minimum of 150mm above roof finishing level into performed grooved 20mm x 20mm & sealed with bituminous sealant; or
Terminated aluminum flashing bar mechanically fastened at 300 O.C. and completely sealed with bituminous sealant; or
Terminated into performed groove, sealed with bituminous sealant followed by installation of aluminum flashing bar mechanically fastened at 300 O.C. and sealed with bituminous sealant.
Water Test:
The water test can be done with flood testing. Minimum water head level and duration of the water test as per project requirements and engineer's instruction must be followed.
Plug the drains and provide necessary barriers to contain flood water to avoid pressure and damage the membrane.
Removal of water and cleaning/drying of the tested area must be done after the water test is completed.
Thermal Insulation:
Apply extruded polystyrene rigid board thermal insulation, loose laid with rebated edges over the completed and water tested waterproofing membrane system.
Separation Layer:
Apply a layer of non-woven geotextile separation layer with minimum of 100mm wide overlaps, loosely laid, above the installed waterproofing membrane, minimum of 50mm wide overlaps to the adjacent sheets.
Finishing Items:
Application of finishing items above the separation layer (i.e.: Precast Concrete Pavers / Gravel) shall be provided & installed as project specification requirements.
Storage Conditions:
Products must be stored in their original packaging under cool and dry conditions. They must be protected from direct sunlight & rain.